Plumbing
Leaks, blockages, water pumps, and hot water.
- Call-out fee
- Rp 100.000
- Rate
- Rp 100.000 / hour
- Minimum
- 1 hour minimum
Indicative price. You pay GoTask after the job is done — transfer, QRIS or cash. Extra costs are always agreed with you before work starts.
Included
- Diagnosis
- Labour for leaks, taps, toilets, blockages
Not included
- Pipes, fittings, pumps
- Septic tank emptying
Possible extra costs
- Materials at cost, shown with receipt
- Pump replacement quoted separately